1)Jin Zhao,Hongtao Wang,Yutian Liu,et.al.Utility-Oriented On-Line Load Restoration Considering Wind Power Penetration[J],IEEE trans on Sustainable Energy. 2018,early access. 2)张旭,王洪涛.高比例可再生能源电力系统的输配协同优化调度方法[J],2018,电力系统自动化, 已录用. XuZhang,HongtaoWang.Cooperative optimal dispatching method of Transmission and Distribution for High proportion Renewable Energy Power system[J],2018, Automation of Power system, hired 3) 赵瑾,王洪涛,曹曦.计及风电条件风险价值的负荷恢复双层优化[J]. 中国电机工程学报,2017,37(18):5275-5285 Jin Zhao,Hongtao Wang,Xi Cao.Double layer optimization of load recovery considering wind power condition risk value [J].Chinese Journal of Electrical Engineering,201737(18):5275-5285 4)曹曦,王洪涛.大规模电网源荷协调恢复决策与控制方法.[J]. 中国电机工程学报,2017,37(6):1666-1675 Xi Cao,Hongtao Wang.Decision and Control method for coordinated recovery of Source load in Large-Scale Power Grid.[J].Chinese Journal of Electrical Engineering, 201737(6): 1666-1675 5) Xi Cao,Hongtao Wang,Yutian Liu,et al.Coordinating self-healing control of bulk power transmission system based on a hierarchical top-down strategy.International Journal of Electric Power & Energy Systems.vol90,September 2017, pages 147-157. 6)王浩,王洪涛,王春义. 计及冰雪天气影响的风电场短期出力模型. 电力系统保护与控制.2016,44(8):107-114 Hao Wang,Hongtao Wang,Chunyi Wang.A short-term wind farm model considering the effects of ice and snow weather. Protection and control of power systems-2016-44 (8): 107-114 7)何成明,王洪涛,王春义. 风电功率爬坡事件作用下考虑时序特性的系统风险评估. 电力自动化设备. 2016,36(1):35-41 Chengming He, Hongtao Wang, Chunyi Wang. System risk assessment considering timing characteristics under wind power climbing event. Electric power automation equipment. 2016 36 (1): 35-41 8)陈彬,王洪涛,曹曦. 计及负荷模糊不确定性的网架重构后期负荷恢复优化. 电力系统自动化.2016,36(24):1-7 Bin Chen, Hongtao Wang, Xi Cao. Load recovery optimization in the later stage of grid reconfiguration considering fuzzy uncertainty of load. Automation of power systems-2016-36 (24): 1-7 9) 何成明,王洪涛. 风电场与AGC机组分布式协同实时控制,中国电机工程学报,2015,35(2):302-309 Chengming He, Hongtao Wang. Distributed Cooperative Real-time Control of Wind Farm and AGC Unit, CSEE, 2015N35 (2): 302-309 10) 曹曦,王洪涛,刘玉田. 输电网架恢复的分层协同优化方法[J].中国电机工程学报,2015,35 (19): 4906-4917. Xi Cao, Hongtao Wang, Yutian Liu. Hierarchical cooperative optimization method for grid restoration [J]. Chinese Journal of Electrical Engineering, 2015,35 (19): 4906-4917. 11) 陈彬,王洪涛. 电力系统恢复过程中的工频过电压动态优化控制[J]. 电力系统自动化. 2015,39(14):54-59 Bin Chen, Hongtao Wang. Dynamic optimal Control of Power Frequency overvoltage in Power system recovery process [J]. Power system automation. 2015 39 (14): 54-59 12) 李超,王洪涛. 含大型风电场的弱同步电网协调控制策略. 电力自动化设备. 2015, 35(4):96-103 Chao Li, Hongtao Wang. Coordinated control strategy for weak synchronous power grid with large wind farms. Electric power automation equipment. 2015, 35 (4): 96-103 13)Wang Hongtao, Liu Xu, Wang Chunyi. Probabilistic production simulation of a power system with wind power penetration based on improved UGF techniques, Journal of Modern Power Systems and Clean Energy,2013,1(2):183-191 14)王洪涛,刘旭,陈之栩,房光华,傅磊.低碳背景下基于改进通用生成函数法的随机生产模拟,电网技术,2013,37(3):597-603 Hongtao Wang,Xu Liu,Zhixu Chen,Guanghua Fang,Lei Fu.Stochastic production Simulation based on improved Generalized Generation function method in low carbon context, Power Grid Technology, 2013 / 37 (3): 597-603 15)何成明,王洪涛,孙华东,陈得治.变速风机调频特性分析及风电场时序协同调频控制策略设计,电力系统自动化,2013,37(9) Chengming He,Hongtao Wang,Huadong Sun,Dezhi Chen. Analysis of Frequency Modulation characteristics of variable Speed Fan and Design of timing Synergetic Frequency Modulation Control Strategy for Wind Farm, Automation of Power system, 2013 / 37 (9) 16)Li Xueting, Wang Hongtao. Operation Risk Assessment of Wind Farm Integrated System Influenced by Weather Conditions, IEEE General Meeting 2013. 17)王洪涛,刘雪芳.含风电场群的区域电网两层多阶段电压协调控制方法, 电力系统保护与控制, 2012, 40(22):1-7. Hongtao Wang, Xuefang Liu. Two-layer and Multi-stage coordinated Voltage Control method for Regional Power Grid with Wind Farm Group, Power system Protection and Control, 2012,40 (22): 1-7. 18)Chengming He; Hongtao Wang; Huadong Sun.Variable Parameters Primary Frequency Control Strategy of DFIG. Asia-Pacific Power and Energ 19)Xu Liu, Hongtao Wang. Power System Probabilistic Cost Production Simulation With Wind Power Penetration Using Universal Generating Function Methods. Asia-Pacific Power and Energy Engineering Conference, Shanghai, March 2012. 20)Xuefang Liu,Hongtao Wang.Area Automatic Voltage Control of Large-scale Wind Farms. Asia-Pacific Power and Energy Engineering Conference, Shanghai, March 2012. 21)Xu Liu; Hongtao Wang.Multi-Area Scale Electric Power and Energy Balance with High Wind Power Penetration Based Stackelberg Decision Theory.IEEE PES ISGT ASIA, 2012 22)Xueting Li;Hongtao Wang.Stochastic Time Series Reconstruction of Future Wind Farm Output . IEEE PES ISGT ASIA, 2012. 23)Chengming He; Hongtao Wang.Research on Primary Frequency Control Strategy Based on DFIG.IEEE PES ISGT ASIA, 2012. 24)Xuefang Liu; Hongtao Wang. Area Automatic Voltage Control Based on Wind Power Forecasting 25) Xu Liu; HongtaoWang. Power System Probabilistic Cost Production Simulation with Wind Power Penetration Based on Multi-State System Theory. IEEE General Meeting 2012 26) 王洪涛,何成明. 计及风电预测误差带的调度计划的渐进优化模型,电力系统自动化,2011,35(22):131-135. Hongtao Wang, Chengming He. A Progressive Optimization Model for scheduling with Wind Power forecasting errors, Automation of Power Systems, 2011 / 35 (22): 131-135. 27) HongtaoWang,YatingZhang, QinyongZhou. Wind Farm Model with DFIG for Small Signal Stability Study. 2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies, p 303-307, 2011. 28) Hongtao Wang; ChengmingHe; Qinyong Zhou.The power system dispatching rolling optimization model based on the coordination of day-ahead and within-day wind-power prediction. DRPT 2011 - 2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies, p 698-702, 2011. 29)Hongtao Wang ,Yutian Liu.Research on the Black Start Field Test of Shandong Power Grid Based on PDCA Cycle. International Conference on Electrical and Control Engineering,ICECE 2010. 30) Hongtao Wang ,Yutian Liu. Pareto Optimization of Power System Reconstruction Using NSGA-II algorithm. Asia-Pacific Power and Energy Engineering Conference(APPEEC 2010). 31)王洪涛,袁森,邱夕兆,房光华,王春义,刘玉田.遵循PDCA循环的山东电网黑启动试验研究,电力系统自动化设备.2010,30(2):145-149 Hongtao Wang,Sen Yuan, Xizhao Qiu, Guanghua Fang, Chunyi, Wang,Yutian Liu. Study on black-start test of Shandong power grid following PDCA cycle, automation equipment of power system. 201030 (2): 145-149 32)王洪涛,刘玉田. 基于NSGA-II的多目标输电网架最优重构.电力系统自动化,2009,33(23):14-18 Hongtao Wang, Yutian Liu. Optimal Reconfiguration of Multi-objective Transmission Grid based on NSGA-II. Power system Automation, 2009 / 03 (23): 14-18 33)王洪涛, 刘玉田, 邱夕兆. 基于多agent的电力系统主从递阶恢复决策. 电力系统自动化,2006,30(15):5-9 (EI: 064010140869) Hongtao Wang, Yutian Liu, Xizhao Qiu. Power system Master-Slave hierarchical Restoration decision based on multiple agent. Automation of Power Systems, 2006 30 (15): 5-9 (EI: 064010140869) 34)王洪涛, 刘玉田. 电力系统恢复的主从递阶决策模型及其优化算法. 中国电机工程学报.2007,27(1):8-13 (EI:071610557116) Hongtao Wang, Yutian Liu. Power system Restoration based on Master-Slave hierarchical decision Model and its Optimization algorithm. Chinese Journal of Electrical Engineering. 2007 27 (1): 8-13 (EI:071610557116) 35)HongtaoWang, YutianLiu. Power system restoration collaborative grid based on grid computing environment. 2005 IEEE Power Engineering Society General Meeting, San Francisco, USA, 2005, Vol 2: 2985-2990 (EI:05097867746) 36)HongtaoWang, YutianLiu. Hierarchical Case-Based Decision Support system for Power System Restoration. 2004 IEEE Power Engineering General Meeting, Danver, USA, 2004,Vol 1:1115-1119 (EI:05078838580) 37)王洪涛, 刘玉田, 邱夕兆. 基于分层案例推理的黑启动决策支持系统. 电力系统及其自动化,2004,28(11):49-52 (EI: 04298263138) Hongtao Wang, Yutian Liu, Xizhao Qiu. Black start decision support system based on hierarchical Case-Based reasoning (CBR). Power Systems and its Automation, 2004 / 28 (11): 49-52 (EI: 04298263138) 38)HongtaoWang, YutianLiu. Generator Field Overvoltages Due to Energizing Lines. 2002 International Conference on Power System Technology, Kunming, China, 2002, Vol 4:2122-2125 (ISTP: BW09Z ) 39)王洪涛, 刘玉田等. 空载线路合闸对发电机励磁回路的影响. 中国电力,2002,35(7):31-34 (EI: 02417136227) Hongtao Wang, Yutian Liu, et al. The influence of No-load Circuit closing on Generator excitation Circuit. China Electric Power Co., 2002! 35 (7): 31-34 (EI: 02417136227) 40) 王洪涛, 刘玉田等. 电网互联对山东电网低频振荡模式的影响.中国电力,2004,37(6):12-15 Hongtao Wang, Yutian Liu, et al. Influence of Power Grid Interconnection on low Frequency Oscillation Mode of Shandong Power Grid. China Electric Power Company, 2004 17 (6): 12-15 41)Bin Chen,Hongtao Wang,Zhongkang Wei,Chunyi Wang. Sustained Overvoltage Control Considering Power System Restoration Dynamic Process.2014 2nd International Conference on Energy Research and Power Engineering,ERPE 2014, Dalian, Liaoning,May 2014. 42)Hao Wang, Hongtao Wang, Hao Gong. A REGION-BASED METHOD FOR HIGH-RISK WIND POWER RAMP EVENTS DETECTION . The 4th IET Renewable Power Generation Conference. Beijing, China, Oct. 2015. 43)Hao Wang, Hongtao Wang, Yingzhe Jia. A Method for Estimating Wind Power Ramps During Ice Storm. IEEE Region 10 Conference(IEEE TENCON 2015), Macau, China, Nov. 2015. 44)Wei Teng, Hongtao Wang, Yingzhe Jia. Construction and Control Strategy Research of Black Start Unit Containing Wind Farm. IEEE Region 10 Conference(IEEE TENCON 2015), Macau, China, Nov. 2015. 45)Xinyuan Tong, Hongtao Wang. Spinning Reserve Model in Response to Wind Power Ramp Events at Sub-Hourly Time-scale[C]. The 5th international conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT 2015), Changsha China,Nov. 2015. Work: 刘玉田,王洪涛,叶华.电力系统恢复理论与技术.科学出版社,2014.3 Yutian Liu, Hongtao Wang, Hua Ye. Theory and Technology of Power system recovery. Science Press, 2014.3 Prize: (1) Excellent selection of recovery Strategy and Scheme for UHV Power Grid. First prize for scientific and technological progress of Shandong Province in 2010. Yutian Liu (first), Hongtao Wang (third) (2) Key Technology and Engineering Application of Simulation Analysis and Dispatch Control for intermittent Multi-source combined Generation system. Second prize for scientific and technological progress of State Grid Corporation 2014 (3) tudy on the security and stability of the interconnection between Shandong power grid and adjacent network. 2004 second prize for scientific and technological progress in Shandong province, Liu Yutian (first), Wang Hongtao (third) (4) Shandong power grid black start program. The third prize for scientific and technological progress of Shandong Province in 2004. Yutian Liu (second), Hongtao Wang (forth) (5) Research and Countermeasure of large scale Wind Power acceptance ability based on Safety and Stability and Wind Power efficiency. Shandong Electric Power Science and Technology first prize. Hongtao Wang (sixth ) Patent: (1) Invention patent: black-start aided decision support system / training system and its method. Patent number: ZL 2008 100 14125.4. Inventor: Hongtao Wang, Yutian Liu (2) invention patent: the method of determining the maximum load in the recovery process of DC support weak receiver system. Patent number: ZL 2010 1058 8379.4. Inventor: Hongtao Wang, Yutian Liu (3) Patent of invention: design method of additional frequency controller for doubly-fed variable speed wind turbine. Patent number: ZL 201210045545.5. Inventor: Hongtao Wang, Yutian Liu (4) Invention patent: multi-reactive power source hierarchical coordination of wind farm voltage control method. Patent number: ZL201210045967.2. Inventor: Hongtao Wang, Yutian Liu (5) Patent of invention: parameter setting method of wind farm side damping controller based on wide area measurement signal. Patent number: ZL201210046145.6. Inventor: Hongtao Wang, Yutian Liu (6)Invention patent:multi-time navigation-aided decision support system for recovery. Patent number: ZL 2013 10198881.8. Inventor: Hongtao Wang, Yutian Liu, Xi Cao (7) Patent of invention: a method to determine the grid capacity of wind farm considering voltage constraints. Patent number: ZL 2015 1 0493790.6 inventor: Chunyi Wang, Hongtao Wang, Zenggong Cao, Hao Gong (8) Invention patent: high-proportion renewable energy power system transmission and distribution coordination dispatching goal cascade analysis method. Patent number accepted: 201810465163.5 inventors: Hongtao Wang, Xu Zhang, Liang Tang, Chenjun Sun, Zhuoran Wang |